Fixture
M01Matte Black Shower System
A graphic silhouette in the wet zone.
A shower valve, rain head, and hand shower set with a matte black finish.
- Installed
- $350–$1,200
- per set
- Moisture
- 9/10
- Slip
- 3/10
A measured index of the American bathroom
Vol. 01 / November 2026 / Costs in USD
Combination 035 / 180
A measured plan for an industrial concrete family bath at 9 by 11 feet, with the layout limits, material set, and cost lines in one place.
Palette
Industrial Concrete
Moisture
7.6/10
Slip
5.7/10
Upkeep
Moderate
The measured brief
This 99 sq ft family bath is defined by its proportions: 9 feet across and 11 feet deep. Two sinks need at least 30 inches of center-to-center spacing. The Industrial Concrete answer is to keep the wet zone legible and spend the remaining wall space on storage and light.
A troweled microcement wall with visible movement and a matte sealer. Black steel shower framing or a black grid glass partition. Those two moves do more for the room than a decorative feature wall.
Plan the wet zone first. A double vanity needs two supplies and two drains, or a shared drain with a proper vent. Keep the tub-shower and toilet on the same wet wall to reduce runs. Use a double vanity with drawers, a tall linen cabinet, and a niche in the tub-shower. A hook rail near the tub keeps towels off the floor.
The material set is short by design: Matte Black Shower System, Terrazzo, and Tankless Water Heater. A graphic silhouette in the wet zone. Aggregate, binder, and a thousand small decisions. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.
At $20,000–$47,900, the estimate lands between $202 and $484 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.
The same industrial concrete palette would price differently in a larger room, but the bigger shift is geometric. The toilet should be out of the direct vanity sight line. That is why the layout is part of the style decision rather than a separate drawing exercise.
“A 99 sq ft bath with two sinks and a separate wet zone.”
Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 3/10.
The plan
The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.
Plumbing
A double vanity needs two supplies and two drains, or a shared drain with a proper vent. Keep the tub-shower and toilet on the same wet wall to reduce runs.
Storage
Use a double vanity with drawers, a tall linen cabinet, and a niche in the tub-shower. A hook rail near the tub keeps towels off the floor.
Lighting
Use two 3000 K vanity lights or a long diffused strip, plus a moisture-rated light in the tub-shower. Put the vanity lights on a dimmer.
The material set
One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.
Fixture
M01A graphic silhouette in the wet zone.
A shower valve, rain head, and hand shower set with a matte black finish.
Composite surface
M02Aggregate, binder, and a thousand small decisions.
A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops.
Equipment
M03Endless hot water, sized to the load.
A wall-mounted water heater that heats water on demand instead of storing it in a tank.
| Material | Type | Compatibility | Cost | Moisture | Slip | Upkeep |
|---|---|---|---|---|---|---|
| Matte Black Shower System | Fixture | 9.0/10 | $350–$1,200 / set | 9/10 | 3/10 | Moderate |
| Terrazzo | Composite surface | 9.0/10 | $18–$35 / sq ft | 9/10 | 8/10 | Low |
| Tankless Water Heater | Equipment | 8.0/10 | $900–$2,500 / unit | 8/10 | 1/10 | Moderate |
Material note / 01
Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 3/10.
Material note / 02
Terrazzo — A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 8/10.
Material note / 03
Tankless Water Heater — A wall-mounted water heater that heats water on demand instead of storing it in a tank. It is specified for the family bath layout, where its dimensions and moisture performance matter. Moisture 8/10, slip 1/10.
The cost
Line-item estimate for a 99 sq ft family bath in the Industrial Concrete style. The range assumes the existing plumbing stack stays in place.
| Cost line | Low | High | Share of high |
|---|---|---|---|
| Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away. | $1,000 | $1,700 | 4% |
| Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test. | $500 | $900 | 2% |
| Plumbing rough-in5 fixture connections; assumes the stack stays in place. | $2,300 | $4,350 | 9% |
| Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches. | $1,650 | $3,500 | 7% |
| Wall and floor finishesTile, stone, or microcement, including setting materials and trim. | $2,150 | $4,750 | 10% |
| Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim. | $4,350 | $9,300 | 19% |
| Vanity and millwork2 basins; includes cabinet, top, and installation. | $1,850 | $5,150 | 11% |
| Design, permits, and inspectionsDrawing, permit fees, and inspection coordination. | $800 | $2,000 | 4% |
| Labor and project managementCoordination, site protection, and trade supervision. | $3,250 | $8,900 | 19% |
| ContingencyReserved for hidden conditions and owner changes. | $2,150 | $7,300 | 15% |
| Total project | $20,000 | $47,900 | $202–$484 / sq ft |
Estimated $20,000–$47,900 total / $202–$484 per sq ft / 30–45 working days.
Budget reading
$20,000–$47,900
$202–$484 per sq ft
Build window
30–45 days
After permits. Custom glass, stone, and millwork add lead time before installation.
Design moves
Move / 01
01The vanity should have 24 inches of counter at each end if possible. Mark it on the floor before demolition and check it against every fixture you order.
Move / 02
02Matte Black Shower System is the strongest visual investment in this scheme. Keep the other surfaces quieter so the budget reads as intention rather than compromise.
Move / 03
03A troweled microcement wall with visible movement and a matte sealer. Repeat that material at the shower niche or vanity rather than introducing a second accent.
Move / 04
04Use a double vanity with drawers, a tall linen cabinet, and a niche in the tub-shower. A hook rail near the tub keeps towels off the floor. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.
The watchouts
The five items below are the highest-risk details in this combination. Two sinks need at least 30 inches of center-to-center spacing.
Two sinks need at least 30 inches of center-to-center spacing.
01The toilet should be out of the direct vanity sight line.
02Sealed concrete and microcement need periodic re-sealing.
03Dark surfaces show soap residue and hard-water film.
04Faux brick veneer in the shower zone.
05Keep comparing
The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.
Industrial Concrete / Shared bath
001Plan an industrial concrete bathroom in a jack-and-jill bathroom: layout limits, three compatible materials, a $20,200–$48,300 cost breakdown, and a practical FAQ.
Industrial Concrete / Galley bath
002Plan an industrial concrete bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $12,600–$30,600 cost breakdown, and a practical FAQ.
Industrial Concrete / Family bath
003Plan an industrial concrete bathroom in a split wet-dry bath: layout limits, three compatible materials, a $15,800–$37,900 cost breakdown, and a practical FAQ.
Industrial Concrete / Guest bath
004Plan an industrial concrete bathroom in a 5×8 small guest bath: layout limits, three compatible materials, an $11,600–$28,500 cost breakdown, and a practical FAQ.
Field guides
Budget / 8 min
G01How to build a bathroom budget that survives hidden conditions, allowances, and change orders.
Lighting / 8 min
G02How to choose kelvin, CRI, and fixture placement for grooming, relaxing, and safe wet-zone use.
Budget and value / 9 min
G03A realistic look at bathroom remodel payback, cost bands, and the upgrades that hold value.
FAQ
Practical answers drawn from the specification, cost model, and installation sequence.