Industrial Concrete bathroom in a Tub-to-Shower Conversion.

A measured plan for an industrial concrete converted bath at 5 by 8 feet, with the layout limits, material set, and cost lines in one place.

40 sq ft5′ × 8′18–30 days$12,000–$29,100

Palette

Industrial Concrete

1.05 index

Moisture

8.1/10

Slip

6.3/10

Upkeep

Low

The measured brief

This 40 sq ft converted bath is defined by its proportions: 5 feet across and 8 feet deep. The existing drain may need to move to the center of the new pan. The Industrial Concrete answer is to keep the wet zone legible and spend the remaining wall space on storage and light.

A troweled microcement wall with visible movement and a matte sealer. Black steel shower framing or a black grid glass partition. Those two moves do more for the room than a decorative feature wall.

Plan the wet zone first. Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout. Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.

The material set is short by design: Matte Black Shower System, Terrazzo, and Liquid Waterproofing Membrane. A graphic silhouette in the wet zone. Aggregate, binder, and a thousand small decisions. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.

At $12,000–$29,100, the estimate lands between $300 and $728 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.

What changes when the room changes

The same industrial concrete palette would price differently in a larger room, but the bigger shift is geometric. The shower opening should be at least 24 inches wide. That is why the layout is part of the style decision rather than a separate drawing exercise.

“Same footprint, better daily use.”

Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the converted bath layout. Moisture 9/10, slip 3/10.

The plan

Tub-to-Shower Conversion, drawn to scale.

The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.

Measured floor plan for the Tub-to-Shower Conversion: 5 by 8 feet, 40 square feet. 60 in curbless shower60 in curbless shower24 in vanity24 in vanityToilet30 in doorLinear drainFixed glass5′–0″8′–0″N
Tub-to-Shower Conversion / 5′ × 8′ / 40 sq ftDrawing not to scale

Plumbing

Reuse the tub drain if the new pan aligns with it; otherwise relocate the drain before the pan is poured. A linear drain at the back wall simplifies the slope and tile layout.

Storage

Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit.

Lighting

A 3000 K shower light and a separate vanity light are ideal. Make the shower light moisture-rated and place it outside the direct spray.

The material set

Three materials, three jobs.

One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.

Skip to cost
Matte Black Shower System material section and layer build-up01020304MATERIAL / BRUSHEDNOT TO SCALE

Fixture

M01

Matte Black Shower System

A graphic silhouette in the wet zone.

A shower valve, rain head, and hand shower set with a matte black finish.

Installed
$350–$1,200
per set
Moisture
9/10
Slip
3/10
Terrazzo material section and layer build-up01020304MATERIAL / SPECKLENOT TO SCALE

Composite surface

M02

Terrazzo

Aggregate, binder, and a thousand small decisions.

A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops.

Installed
$18–$35
per sq ft
Moisture
9/10
Slip
8/10
Liquid Waterproofing Membrane material section and layer build-up01020304MATERIAL / COATNOT TO SCALE

Membrane

M03

Liquid Waterproofing Membrane

A continuous skin for complex corners.

A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms.

Installed
$3–$7
per sq ft
Moisture
10/10
Slip
4/10
Selected materials for the Industrial Concrete bathroom in a Tub-to-Shower Conversion, with compatibility, cost, and performance ratings.
MaterialTypeCompatibilityCostMoistureSlipUpkeep
Matte Black Shower SystemFixture10.0/10$350–$1,200 / set9/103/10Moderate
TerrazzoComposite surface9.0/10$18–$35 / sq ft9/108/10Low
Liquid Waterproofing MembraneMembrane8.0/10$3–$7 / sq ft10/104/10Low

Material note / 01

Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the converted bath layout. Moisture 9/10, slip 3/10.

Material note / 02

Terrazzo — A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 8/10.

Material note / 03

Liquid Waterproofing Membrane — A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 4/10.

The cost

A $12,000–$29,100 plan.

Line-item estimate for a 40 sq ft converted bath in the Industrial Concrete style. The range assumes the existing plumbing stack stays in place.

Estimated cost lines for the Industrial Concrete bathroom in a Tub-to-Shower Conversion.
Cost lineLowHighShare of high
Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away.$500$8503%
Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test.$450$8003%
Plumbing rough-in3 fixture connections; assumes the stack stays in place.$1,300$2,4008%
Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches.$1,200$2,7009%
Wall and floor finishesTile, stone, or microcement, including setting materials and trim.$950$2,0507%
Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim.$2,450$5,20018%
Vanity and millwork1 basin; includes cabinet, top, and installation.$1,300$3,70013%
Design, permits, and inspectionsDrawing, permit fees, and inspection coordination.$600$1,5505%
Labor and project managementCoordination, site protection, and trade supervision.$1,950$5,40019%
ContingencyReserved for hidden conditions and owner changes.$1,300$4,45015%
Total project$12,000$29,100$300–$728 / sq ft

Estimated $12,000–$29,100 total / $300–$728 per sq ft / 18–30 working days.

Budget reading

$12,000–$29,100

$300–$728 per sq ft

  • Finishes and fixtures are the adjustable lines.
  • Waterproofing, plumbing, and labor are not the place to cut.
  • Contingency is included; keep it for hidden conditions.
  • Moving the stack or adding steam will push the high number higher.

Build window

18–30 days

After permits. Custom glass, stone, and millwork add lead time before installation.

Design moves

Four decisions that make the plan work.

Move / 01

01

Let one material carry the cost

Matte Black Shower System is the strongest visual investment in this scheme. Keep the other surfaces quieter so the budget reads as intention rather than compromise.

Move / 02

02

Anchor the room with one signature material

A troweled microcement wall with visible movement and a matte sealer. Repeat that material at the shower niche or vanity rather than introducing a second accent.

Move / 03

03

Plan storage at the edges

Add a niche in the shower and a shallow cabinet where the tub deck used to be. A bench can provide storage and a place to sit. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.

Move / 04

04

Design for the messiest day

The shower opening should be at least 24 inches wide. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.

The watchouts

What to resolve before tile.

The five items below are the highest-risk details in this combination. The existing drain may need to move to the center of the new pan.

  1. The existing drain may need to move to the center of the new pan.

    01
  2. The shower opening should be at least 24 inches wide.

    02
  3. Sealed concrete and microcement need periodic re-sealing.

    03
  4. Dark surfaces show soap residue and hard-water film.

    04
  5. Faux brick veneer in the shower zone.

    05

What carries the plan

  • Microcement creates a continuous surface with no grout to scrub.
  • Improves access and safety without moving walls.
  • Strong visual contrast with minimal effort.
  • Durable and repairable surface with a long service life.
  • Conforms to complex shapes and niches.

What can undermine it

  • Sealed concrete and microcement need periodic re-sealing.
  • Loses the only tub in a small home.
  • Shows soap scum and hard-water spots.
  • Poured terrazzo is expensive and requires specialists.
  • Requires correct thickness and cure time.

Keep comparing

Four nearby combinations.

The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.

Open the full matrix

Industrial Concrete / Guest bath

001

5×8 Small Guest Bath

Plan an industrial concrete bathroom in a 5×8 small guest bath: layout limits, three compatible materials, an $11,600–$28,500 cost breakdown, and a practical FAQ.

Size
5′ × 8′
Budget
$11,600–$28,500
Build
16–28 d
Matte Black Shower SystemTerrazzoCeiling Exhaust Fan
Open the plan

Industrial Concrete / Accessible bath

002

Accessible Walk-In Bath

Plan an industrial concrete bathroom in an accessible walk-in bath: layout limits, three compatible materials, a $16,700–$39,900 cost breakdown, and a practical FAQ.

Size
8′ × 10′
Budget
$16,700–$39,900
Build
32–48 d
Matte Black Shower SystemMicrocementLiquid Waterproofing Membrane
Open the plan

Industrial Concrete / Galley bath

003

Narrow Galley Bathroom

Plan an industrial concrete bathroom in a narrow galley bathroom: layout limits, three compatible materials, a $12,600–$30,600 cost breakdown, and a practical FAQ.

Size
5′ × 10′
Budget
$12,600–$30,600
Build
20–32 d
Matte Black Shower SystemTerrazzoCeiling Exhaust Fan
Open the plan

Industrial Concrete / Half bath

004

Under-Stairs Half Bath

Plan an industrial concrete bathroom in an under-stairs half bath: layout limits, three compatible materials, an $8,600–$21,200 cost breakdown, and a practical FAQ.

Size
4′ × 6′
Budget
$8,600–$21,200
Build
14–25 d
TerrazzoMatte Black Shower SystemCeiling Exhaust Fan
Open the plan

Field guides

The systems behind this plan.

All 15 guides

FAQ

Industrial Concrete in a Tub-to-Shower Conversion: the questions.

Practical answers drawn from the specification, cost model, and installation sequence.

How much does an Industrial Concrete bathroom in a Tub-to-Shower Conversion cost?
A full remodel at this specification is estimated at $12,000–$29,100, or $300 to $728 per square foot. The largest lines are wall and floor finishes ($950–$2,050) and fixtures ($2,450–$5,200). The range assumes the stack stays in place and the recommended materials are used. Moving the toilet or tub, adding a steam generator, or choosing solid slab stone can push the upper number higher.
Will Industrial Concrete work in a 5′ × 8′ converted bath?
Yes, if the plan respects the room's actual limits. The existing drain may need to move to the center of the new pan. Works well in larger rooms where the concrete planes can be seen. In a powder room, limit concrete to one wall and use a lighter floor to avoid a cave effect. Keep the first priority on the clear path and the wet-zone detailing, then let the palette do the rest.
Which three materials should I specify?
Matte Black Shower System, Terrazzo, and Liquid Waterproofing Membrane form the core specification. Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the converted bath layout. Moisture 9/10, slip 3/10. Terrazzo — A composite surface of stone chips set in cement or resin, used for floors, walls, and vanity tops. It belongs to the Industrial Concrete material family and keeps the palette coherent. Moisture 9/10, slip 8/10. Liquid Waterproofing Membrane — A trowel- or roller-applied waterproof coating used under tile in showers and wet rooms. It is specified for the converted bath layout, where its dimensions and moisture performance matter. Moisture 10/10, slip 4/10. Use the material pages for installation notes and current cost bands.
How long does this combination take to build?
Plan for 18 to 30 working days after permits. The sequence is demolition, rough-in, waterproofing and flood test, tile, fixtures, glass, and punch list. Custom millwork or a stone tub can add lead time before installation begins.
What lighting temperature suits this bathroom?
Use 2700 K at 90+ CRI as the base. 2700 K at 90 CRI keeps concrete from reading blue. Use a dimmer and avoid cool white LEDs over the mirror. Put the vanity light at eye level and keep a separate dimmed circuit for the shower and night path.
Is this combination a good resale decision?
It is strongest when the layout fixes a daily problem and the palette stays broadly appealing. Microcement creates a continuous surface with no grout to scrub. Avoid over-improving for the neighborhood and keep the waterproofing, ventilation, and plumbing documentation; those are the details a buyer's inspector can verify.