A measured plan for an industrial concrete primary ensuite at 10 by 12 feet, with the layout limits, material set, and cost lines in one place.

120 sq ft10′ × 12′32–47 days$21,900–$52,100

Palette

Industrial Concrete

1.05 index

Moisture

7.6/10

Slip

6/10

Upkeep

Moderate

The measured brief

This 120 sq ft primary ensuite is defined by its proportions: 10 feet across and 12 feet deep. Keep 36 inches between the vanity and the tub or shower. The Industrial Concrete answer is to keep the wet zone legible and spend the remaining wall space on storage and light.

A troweled microcement wall with visible movement and a matte sealer. Black steel shower framing or a black grid glass partition. Those two moves do more for the room than a decorative feature wall.

Plan the wet zone first. A double vanity, shower, tub filler, and toilet require a larger supply and drain layout. Put the tub filler on a dedicated line and confirm the floor structure for a stone tub. Use a double vanity with deep drawers, a tall linen cabinet, and a bench or niche in the shower. Keep daily items within reach of the sink and reserve the tall cabinet for towels.

The material set is short by design: Microcement, Matte Black Shower System, and Tankless Water Heater. A seamless surface with the depth of stone. A graphic silhouette in the wet zone. Together they cover the surface, fitting, and system layers without introducing a fourth visual language.

At $21,900–$52,100, the estimate lands between $183 and $434 per square foot. The largest allowances are finishes and fixtures; the 12 to 18 percent contingency is not padding in a room with this much hidden plumbing.

What changes when the room changes

The same industrial concrete palette would price differently in a larger room, but the bigger shift is geometric. The shower should be at least 42 inches wide for two-person use. That is why the layout is part of the style decision rather than a separate drawing exercise.

“A 120 sq ft suite with room for a separate tub and shower.”

Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It is compatible with both the Industrial Concrete palette and the primary ensuite layout. Moisture 9/10, slip 8/10.

The plan

Master Ensuite, drawn to scale.

The drawing shows fixture positions, door swing, windows, dimension lines, and the selected style as a color reference. It is a planning drawing, not a permit set.

Measured floor plan for the Master Ensuite: 10 by 12 feet, 120 square feet. 42 in shower42 in showerFreestanding tubFreestanding tubDouble vanityDouble vanityToilet32 in door36 in clearanceLinen10′–0″12′–0″N
Master Ensuite / 10′ × 12′ / 120 sq ftDrawing not to scale

Plumbing

A double vanity, shower, tub filler, and toilet require a larger supply and drain layout. Put the tub filler on a dedicated line and confirm the floor structure for a stone tub.

Storage

Use a double vanity with deep drawers, a tall linen cabinet, and a bench or niche in the shower. Keep daily items within reach of the sink and reserve the tall cabinet for towels.

Lighting

Use 2700 to 3000 K at 90 CRI with separate vanity, shower, and tub circuits. A dimmer on the tub light is worth the extra switch.

The material set

Three materials, three jobs.

One finish, one fixture family, and one technical layer. The compatibility score is a planning signal, not a warranty.

Skip to cost
Microcement material section and layer build-up0102030405MATERIAL / SPECKLENOT TO SCALE

Continuous coating

M01

Microcement

A seamless surface with the depth of stone.

A thin cement-based coating that creates a continuous, matte surface over walls and floors.

Installed
$16–$28
per sq ft
Moisture
9/10
Slip
8/10
Matte Black Shower System material section and layer build-up01020304MATERIAL / BRUSHEDNOT TO SCALE

Fixture

M02

Matte Black Shower System

A graphic silhouette in the wet zone.

A shower valve, rain head, and hand shower set with a matte black finish.

Installed
$350–$1,200
per set
Moisture
9/10
Slip
3/10
Tankless Water Heater material section and layer build-up01020304MATERIAL / MECHANICALNOT TO SCALE

Equipment

M03

Tankless Water Heater

Endless hot water, sized to the load.

A wall-mounted water heater that heats water on demand instead of storing it in a tank.

Installed
$900–$2,500
per unit
Moisture
8/10
Slip
1/10
Selected materials for the Industrial Concrete bathroom in a Master Ensuite, with compatibility, cost, and performance ratings.
MaterialTypeCompatibilityCostMoistureSlipUpkeep
MicrocementContinuous coating10.0/10$16–$28 / sq ft9/108/10Low
Matte Black Shower SystemFixture10.0/10$350–$1,200 / set9/103/10Moderate
Tankless Water HeaterEquipment8.0/10$900–$2,500 / unit8/101/10Moderate

Material note / 01

Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It is compatible with both the Industrial Concrete palette and the primary ensuite layout. Moisture 9/10, slip 8/10.

Material note / 02

Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the primary ensuite layout. Moisture 9/10, slip 3/10.

Material note / 03

Tankless Water Heater — A wall-mounted water heater that heats water on demand instead of storing it in a tank. It is specified for the primary ensuite layout, where its dimensions and moisture performance matter. Moisture 8/10, slip 1/10.

The cost

A $21,900–$52,100 plan.

Line-item estimate for a 120 sq ft primary ensuite in the Industrial Concrete style. The range assumes the existing plumbing stack stays in place.

Estimated cost lines for the Industrial Concrete bathroom in a Master Ensuite.
Cost lineLowHighShare of high
Demolition and disposalRemoval of existing finishes, fixtures, and debris haul-away.$1,200$2,0004%
Waterproofing and shower panMembrane, corners, drain bonding, and a 24-hour flood test.$850$1,5503%
Plumbing rough-in5 fixture connections; assumes the stack stays in place.$2,300$4,3508%
Electrical and ventilationGFCI protection, fan, lighting rough-in, and switches.$1,800$3,8007%
Wall and floor finishesTile, stone, or microcement, including setting materials and trim.$2,650$5,85011%
Fixtures and fittingsToilet, shower valve, tub filler, sink faucets, and drain trim.$4,350$9,30018%
Vanity and millwork2 basins; includes cabinet, top, and installation.$1,900$5,40010%
Design, permits, and inspectionsDrawing, permit fees, and inspection coordination.$900$2,2004%
Labor and project managementCoordination, site protection, and trade supervision.$3,550$9,65019%
ContingencyReserved for hidden conditions and owner changes.$2,350$7,95015%
Total project$21,900$52,100$183–$434 / sq ft

Estimated $21,900–$52,100 total / $183–$434 per sq ft / 32–47 working days.

Budget reading

$21,900–$52,100

$183–$434 per sq ft

  • Finishes and fixtures are the adjustable lines.
  • Waterproofing, plumbing, and labor are not the place to cut.
  • Contingency is included; keep it for hidden conditions.
  • Moving the stack or adding steam will push the high number higher.

Build window

32–47 days

After permits. Custom glass, stone, and millwork add lead time before installation.

Design moves

Four decisions that make the plan work.

Move / 01

01

Anchor the room with one signature material

A troweled microcement wall with visible movement and a matte sealer. Repeat that material at the shower niche or vanity rather than introducing a second accent.

Move / 02

02

Plan storage at the edges

Use a double vanity with deep drawers, a tall linen cabinet, and a bench or niche in the shower. Keep daily items within reach of the sink and reserve the tall cabinet for towels. A recessed cabinet or a shallow niche adds more useful storage than a deeper vanity.

Move / 03

03

Design for the messiest day

The shower should be at least 42 inches wide for two-person use. A bathroom that works after a shower, with wet towels and a full counter, is a better investment than one that only photographs well.

Move / 04

04

Resolve the wet detail before the finish

Use a waterproof membrane beneath microcement and seal the surface every 12 to 24 months. Keep bare steel out of the splash zone. The waterproofing and slope are the real luxury; the surface is the visible layer.

The watchouts

What to resolve before tile.

The five items below are the highest-risk details in this combination. Keep 36 inches between the vanity and the tub or shower.

  1. Keep 36 inches between the vanity and the tub or shower.

    01
  2. The shower should be at least 42 inches wide for two-person use.

    02
  3. Sealed concrete and microcement need periodic re-sealing.

    03
  4. Dark surfaces show soap residue and hard-water film.

    04
  5. Faux brick veneer in the shower zone.

    05

What carries the plan

  • Microcement creates a continuous surface with no grout to scrub.
  • Space for a true double vanity and separate shower.
  • No grout lines to scrub or stain.
  • Strong visual contrast with minimal effort.
  • Endless hot water for long showers.

What can undermine it

  • Sealed concrete and microcement need periodic re-sealing.
  • Plumbing and electrical scope is significantly larger.
  • Requires a skilled applicator and a rigid substrate.
  • Shows soap scum and hard-water spots.
  • Higher upfront cost and installation complexity.

Keep comparing

Four nearby combinations.

The closest alternatives by style, layout, and budget. Open one change at a time so the cost difference has a cause.

Open the full matrix

Industrial Concrete / Family bath

001

Double-Vanity Family Bath

Plan an industrial concrete bathroom in a double-vanity family bath: layout limits, three compatible materials, a $20,000–$47,900 cost breakdown, and a practical FAQ.

Size
9′ × 11′
Budget
$20,000–$47,900
Build
30–45 d
Matte Black Shower SystemTerrazzoTankless Water Heater
Open the plan

Industrial Concrete / Family bath

002

Split Wet-Dry Bath

Plan an industrial concrete bathroom in a split wet-dry bath: layout limits, three compatible materials, a $15,800–$37,900 cost breakdown, and a practical FAQ.

Size
6′ × 10′
Budget
$15,800–$37,900
Build
25–39 d
MicrocementMatte Black Shower SystemHeated Porcelain Tile
Open the plan

Industrial Concrete / Shared bath

003

Jack-and-Jill Bathroom

Plan an industrial concrete bathroom in a jack-and-jill bathroom: layout limits, three compatible materials, a $20,200–$48,300 cost breakdown, and a practical FAQ.

Size
8′ × 12′
Budget
$20,200–$48,300
Build
31–46 d
TerrazzoMatte Black Shower SystemHeated Porcelain Tile
Open the plan

Industrial Concrete / Accessible bath

004

Accessible Walk-In Bath

Plan an industrial concrete bathroom in an accessible walk-in bath: layout limits, three compatible materials, a $16,700–$39,900 cost breakdown, and a practical FAQ.

Size
8′ × 10′
Budget
$16,700–$39,900
Build
32–48 d
Matte Black Shower SystemMicrocementLiquid Waterproofing Membrane
Open the plan

Field guides

The systems behind this plan.

All 15 guides

FAQ

Industrial Concrete in a Master Ensuite: the questions.

Practical answers drawn from the specification, cost model, and installation sequence.

How much does an Industrial Concrete bathroom in a Master Ensuite cost?
A full remodel at this specification is estimated at $21,900–$52,100, or $183 to $434 per square foot. The largest lines are wall and floor finishes ($2,650–$5,850) and fixtures ($4,350–$9,300). The range assumes the stack stays in place and the recommended materials are used. Moving the toilet or tub, adding a steam generator, or choosing solid slab stone can push the upper number higher.
Will Industrial Concrete work in a 10′ × 12′ primary ensuite?
Yes, if the plan respects the room's actual limits. Keep 36 inches between the vanity and the tub or shower. Works well in larger rooms where the concrete planes can be seen. In a powder room, limit concrete to one wall and use a lighter floor to avoid a cave effect. Keep the first priority on the clear path and the wet-zone detailing, then let the palette do the rest.
Which three materials should I specify?
Microcement, Matte Black Shower System, and Tankless Water Heater form the core specification. Microcement — A thin cement-based coating that creates a continuous, matte surface over walls and floors. It is compatible with both the Industrial Concrete palette and the primary ensuite layout. Moisture 9/10, slip 8/10. Matte Black Shower System — A shower valve, rain head, and hand shower set with a matte black finish. It is compatible with both the Industrial Concrete palette and the primary ensuite layout. Moisture 9/10, slip 3/10. Tankless Water Heater — A wall-mounted water heater that heats water on demand instead of storing it in a tank. It is specified for the primary ensuite layout, where its dimensions and moisture performance matter. Moisture 8/10, slip 1/10. Use the material pages for installation notes and current cost bands.
How long does this combination take to build?
Plan for 32 to 47 working days after permits. The sequence is demolition, rough-in, waterproofing and flood test, tile, fixtures, glass, and punch list. Custom millwork or a stone tub can add lead time before installation begins.
What lighting temperature suits this bathroom?
Use 2700 K at 90+ CRI as the base. 2700 K at 90 CRI keeps concrete from reading blue. Use a dimmer and avoid cool white LEDs over the mirror. Put the vanity light at eye level and keep a separate dimmed circuit for the shower and night path.
Is this combination a good resale decision?
It is strongest when the layout fixes a daily problem and the palette stays broadly appealing. Microcement creates a continuous surface with no grout to scrub. Avoid over-improving for the neighborhood and keep the waterproofing, ventilation, and plumbing documentation; those are the details a buyer's inspector can verify.